Justification of Coal Exploitation from the "Cerje – Jovačko Polje" Deposit
In this paper, the problem of the one of the deposits in PE - PEU "Cerje - Jovačko Polje", located in the Despotovac basin, currently not in production phase, was solved. Deposit was opened with two parallel inclines and exploring mining operations are not finished. Within this deposit, certified balance reserves are 6,156,970 t.
